anchoring system造句
例句與造句
- Permanent prestressed ground anchor systems pile
永久性預(yù)應(yīng)力地錨樁基系統(tǒng) - Permanent prestressed ground anchor systems public works category
永久性預(yù)應(yīng)力地錨樁基系統(tǒng) - Study on the three - dimension modeling library of the marine anchor system based on ug
的船舶錨系三維建庫(kù)研究 - A new - structured anchoring system and its application in open - pit slope
一種新型結(jié)構(gòu)錨固體及其在露天邊坡中的應(yīng)用 - The company lung peter gmbh offers services from the ranges plant construction , anchoring systems in addition to water jet cutting
Lung peter gmbh是一家工業(yè)型企業(yè),該企業(yè)制造高精度的拉線裝置、下錨裝置,射水切割,設(shè)備制造。 - It's difficult to find anchoring system in a sentence. 用anchoring system造句挺難的
- The dangerous of canyoneering would rock fall , faulty anchor system , flashflooding , as well as cold water , cold air , change of hypothermia , and little or no chance on rescue
攀峽者2 :攀峽的危險(xiǎn)有墜石、索具出現(xiàn)問(wèn)題、泛洪、以及冰凍的水和空氣、攀峽者體溫過(guò)低、獲救的機(jī)會(huì)幾乎為零。 - The designing principles were discussed . the calculation relating to the constructional type , frame , body , floating and gravitational forces , anchoring system and etc . was studied
摘要本文論述了鐵木結(jié)構(gòu)網(wǎng)箱系統(tǒng)的設(shè)計(jì)原理,提出了網(wǎng)箱結(jié)構(gòu)型式、框架、箱體、浮沉力、錨定系統(tǒng)等的設(shè)計(jì)與計(jì)算方法。 - The dangerous of canyoneering would rock fall , faulty anchor system , flashflooding , as well as cold water , cold air , change of hypothermia , and little or no chance on rescue
攀峽者2 :攀峽的危險(xiǎn)和風(fēng)險(xiǎn)和危險(xiǎn)性有墜石、索具涌現(xiàn)疑問(wèn)和問(wèn)題、泛洪、以同冰凍的水和大氣、攀峽者體溫過(guò)低、獲救的機(jī)會(huì)機(jī)遇幾乎為0 。 - Our product range covers drilling and demolition , direct fastening , diamond and anchoring systems , firestop and foam systems , installation , measuring and screw fastening systems as well as cutting and sanding systems
我們的產(chǎn)品范圍涵蓋鉆孔與鑿破、直接固定、鉆石與安卡錨栓系統(tǒng)、防火與發(fā)泡填縫系統(tǒng)、安裝、定位與螺絲固定系統(tǒng),以及切割與砂磨系統(tǒng)。 - The failure mechanism of anchoring system was analysed , and the failure form and chitical length of anchoring steel bar were determined , factors influencing the properities of anchoring were discussed , and engineering application was carried cent
鋼筋的臨界錨固長(zhǎng)度受錨固材料抗拉強(qiáng)度、鋼筋的相對(duì)保護(hù)層厚度和鋼筋凈間距、鋼筋的直徑和外形等諸多因素的影響,有效錨固深度一般為10d 15d 。 - The emphasis is given on the studying of the horizontal displacement on the retaining structure consist of piles and anchors , which is a frequent type of retaining structure . it is founded that the rigidity of anchors and magnitude of pre - stress are the main factors which influence the deformation of retaining structures . the optimal design method on pile - anchor systems is presented
樁錨支護(hù)是一種常見(jiàn)的基坑支護(hù)模式,本文以樁錨支護(hù)結(jié)構(gòu)水平位移為重點(diǎn),對(duì)支護(hù)結(jié)構(gòu)剛度、支撐剛度與預(yù)應(yīng)力、支護(hù)樁入土深度等對(duì)樁頂水平位移的影響進(jìn)行了分析,指出在樁錨支護(hù)體系中,錨桿支撐剛度及預(yù)應(yīng)力對(duì)基坑變形的影響最為明顯,并通過(guò)工程實(shí)例加以驗(yàn)證。 - It has improved the conventional optimal design methods by simplifying the variables and the optimal program . it considers the bending moment as the main objective function , while the conventional methods regard the construction cost as the objective function . a model has been applied to the prediction of the deformation of pile - anchor systems by using matlab toolbox
從基坑動(dòng)態(tài)設(shè)計(jì)的觀點(diǎn)出發(fā),借助matlab工具箱,建立了深基坑樁錨支護(hù)體系變形預(yù)測(cè)模型,以大量實(shí)測(cè)變形數(shù)據(jù)資料為基礎(chǔ),說(shuō)明采用神經(jīng)網(wǎng)絡(luò)對(duì)基坑支護(hù)系統(tǒng)的位移進(jìn)行預(yù)測(cè)是可行的。 - Anti - sliding pile especially the pile with prestressed anchor cable and the foundation beam with prestressed anchor cable including the single beam and the frame , are the new pattern structures of the pile - anchor system that have been widely used in the slide - resistant engineering . studies on designing theory of these structures are delayed greatly than their applications . there are no specifications to consult and there are many problems when designing and computing these structures
抗滑樁尤其是預(yù)應(yīng)力錨索抗滑樁和預(yù)應(yīng)力錨索地梁(包括單梁和框架梁)是近年來(lái)較多地應(yīng)用于抗滑工程的新型樁錨結(jié)構(gòu),這些結(jié)構(gòu)的設(shè)計(jì)理論研究大大滯后于工程應(yīng)用,其設(shè)計(jì)計(jì)算缺乏相應(yīng)的規(guī)范作指導(dǎo),存在的問(wèn)題較多。 - Another based mathematics model about the anchor cable is used for ship - anchor system . the numerical calculation have been worked by programmed in the matlab language . at the same time the influence that the dragging speed of antisubmarine helicopter and the height over the surface of ocean acts on the shape and the tension of underwater cable , and that the current velocity and the diameter of anchor cable acts on the shape and the tension of anchor cable , has been calculated
把建立的水下拖索數(shù)學(xué)模型和錨索數(shù)學(xué)模型分別應(yīng)用于航空吊放聲納探頭?纜繩動(dòng)力學(xué)系統(tǒng)和船?錨系統(tǒng),采用matlab語(yǔ)言編程進(jìn)行了數(shù)值計(jì)算,同時(shí)分別計(jì)算和分析了反潛直升機(jī)拖速、距海面高度對(duì)拖索形狀和張力的影響以及海流速度、錨索直徑對(duì)錨索形狀和張力的影響。
更多例句: 下一頁(yè)